News

Case Study: Roller Doors

March 30, 2026

https://youtu.be/MAPWMYSZECY GUARD LOAD ARRESTORS PROVIDE SAFETY BACKUP FOR INDUSTRIAL ROLLER DOORS Organisations operating roller shutter doors can...

GUARD LOAD ARRESTORS PROVIDE SAFETY BACKUP FOR INDUSTRIAL ROLLER DOORS Organisations operating roller shutter doors

Case Study: Vertical Conveyors

February 17, 2026

https://youtu.be/Kab-nz0MScY In this installation, GUARD Load Arrest is used to protect loads on a vertical conveyor...

In this installation, GUARD Load Arrest is used to protect loads on a vertical conveyor

Case Study: St George’s Hall

October 17, 2025

Problem: The concert hall’s engineering team reached the conclusion that, to provide a safe system of...

Problem: The concert hall’s engineering team reached the conclusion that, to provide a safe system

Drone Testing with Guard Load Arrestors

July 17, 2024

Problem: When developing next-gen payload drones designed to carry heavy loads, safety during testing is critical....

Problem: When developing next-gen payload drones designed to carry heavy loads, safety during testing is

Case Study: Galvanising Plants

August 17, 2023

Using a load arrestor in a galvanising plant can enhance safety by preventing accidents and injuries related...

Using a load arrestor in a galvanising plant can enhance safety by preventing accidents and injuries related

Enclosed spaces on vessels

May 4, 2023

New regulations concerning enclosed spaces on sea-going vessels were made on 14th Feb 2022. These...

New regulations concerning enclosed spaces on sea-going vessels were made on 14th Feb 2022. These

Case Study: Factory Work at Height

March 6, 2023

Client: Industrial Factory Distributor: Durham Lifting Limited Problem: Globestock's distributor Durham Lifting Limited was requested to solve their...

Globestock's distributor Durham Lifting Limited was requested to solve their customer's problem when accessing a

Case Study: Waste Water Site

October 6, 2022

Client: UK water treatment company Distributor: QAB Systems Problem: The waste water site engineers regularly require access to 6m deep...

The waste water site engineers regularly require access to 6m deep settlement tanks. Historically, access

Company Registration No: 01641128

VAT Registration No: GB 372 3950 43

EORI No: GB372395043000

Unit 6
Mile Oak Industrial Estate
Maesbury Road
Oswestry
SY10 8GA
United Kingdom

UK +44 (0) 1691 654 966

USA +1 (517) 909-3331

© 2026 Globestock Ltd.

Change Region (Current: Not selected)

Sign up to our newsletter

Choose your region:


United Kingdom

Mainland Europe

Americas

Asia

Oceania

Africa